Corporate

Quality Policy

Medical gas systems keep patients alive. Our quality policy sets out how we design, build, test and support every system, under ISO 13485 and ISO 9001 quality management systems.

Certificates

Certified quality management

Both certificates cover the same scope of our work.

Medicabay ISO 13485:2016 certificate
Medical devices

ISO 13485:2016

Medical devices quality management system.

Medicabay ISO 9001:2015 certificate
Quality management

ISO 9001:2015

Quality management system.

Scope of certification

Design, manufacturing, assembly, installation, sales and after-sales services of medical gas systems and equipment, patient bedhead units, intensive care units, nurse call systems, operation pendants, area control and service units, regulators, medical gas central plants, medical gas terminal units, oxygen therapy devices and flowmeters.

Our commitments

Our quality policy

Medicabay management is responsible for this policy and reviews it regularly.

  1. Patient safety first

    Every medical gas system we design, manufacture and install is built around the safety of patients and hospital staff.

  2. Standards and regulations

    We meet the requirements of ISO 13485, ISO 9001 and the applicable regulations, and we work to the standard each project specifies: NFPA 99, ISO 7396-1 or HTM 02-01.

  3. Tested before it leaves us

    Final assembly, integration and functional testing are carried out in our own facility before delivery.

  4. Tested again on site

    Installed systems are tested for leaks, pressure drops and function before commissioning.

  5. Trained people

    We train our own teams and the hospital staff who use and maintain the systems.

  6. Listening to customers

    We review customer feedback, complaints and field experience and act on them.

  7. Continual improvement

    We set quality objectives, measure them and improve our products, processes and suppliers regularly.

How we check

Quality at every stage

Factory

Functional testing

Final assembly, integration and functional testing in our facility in Darıca.

Site

Testing and commissioning

Leak, pressure drop and function tests before the system is commissioned.

Hospital

Training

Training for hospital staff on system use, emergency procedures and maintenance.

After sales

Maintenance and support

Regular maintenance, emergency repair and technical support.

Documents

Need our certificates?

Ask for our ISO certificates and product documentation with your request.

Contact us
Scroll to Top